City of Science & Technology, B-06
Contractor:
Hassan Allam Construction
Consultant:
SHAKER Consultancy Group
System:
Total System Testing & Balancing:
12 AHUs, 48 Fans, 70 VAV Boxes, 6 Pumps, 29 Balancing Valves, 562 Air Terminals.
Contractor:
Hassan Allam Construction
Consultant:
SHAKER Consultancy Group
System:
Total System Testing & Balancing:
12 AHUs, 48 Fans, 70 VAV Boxes, 6 Pumps, 29 Balancing Valves, 562 Air Terminals.