National Olympic Center
Contractor:
CONSUKORRA
Consultant:
Engineering Authority of The Armed Forces
System:
Total System Testing & Balancing:
27 AHUs, 26 Fans, 160 FCU, 3 Chiller, 12 Pumps, 3 Cooling Towers, 12 Pumps, Up to 205 Balancing Valves, Up to 850 Air Terminals.