Sharm El-Sheikh Museum
Contractor:
Madkour Co.
Consultant:
Amar Misr Engineering Consultants (AMC)
System:
Total HVAC system T&B works, including:
6 AHUs, 31 FCUs, 6 Fans, 4 Ch.W pumps, 3 Chillers, 39 Balancing Valves 232 Air Outlets.
Contractor:
Madkour Co.
Consultant:
Amar Misr Engineering Consultants (AMC)
System:
Total HVAC system T&B works, including:
6 AHUs, 31 FCUs, 6 Fans, 4 Ch.W pumps, 3 Chillers, 39 Balancing Valves 232 Air Outlets.