Commissioning

Our Scope of works for Testing Adjusting & Balancing, Technical Building Commissioning & Clean room Performance Testing.

EBC-International is providing its services in the field of commissioning process, Which is a technically based evaluation process that provides a building owner with a building that is complete and operates according to the owner’s project requirements. The commissioning process could include, But is not necessarily limited to, the following components;

  • Design Phase Commissioning.
  • Construction Phase Commissioning.
  • Post Occupancy Phase Commissioning.
commissioning

Our Activates during different phases include but not limited to the following;

Design Phase Activities:

  • Owners Project Requirements (OPR) is developed and reviewed.
  • Create Design Phase Technical.
  • Commissioning Plan.
  • Create Design Phase Issues Log.
  • Facilitate the design kick-off meeting.
  • Design phase Technical Commissioning meetings.
  • Basis of Design (BOD) review.
  • Design Reviews.
  • Create Technical Commissioning specifications.
  • Define Owner training requirements.
  • Define System Manual requirements.
  • Schedule Design Phase Cx Activities.

Construction Phase Activities:

  • Conduct Commissioning Kick off Meeting.
  • Conduct Construction Commissioning meetings.
  • Create commissioning duration schedules.
  • Perform submittal and shop drawing review.
  • Perform site observations for all systems and equipment.
  • Create pre-functional equipment installation check sheets.
  • Perform pre-functional equipment check sheets.
  • Create pre-functional equipment startup check sheets.
  • Perform pre-functional equipment Start Up.
  • Observe and document static tests.
  • Create and perform (FPT) Functional Performance.
  • Tests (FPT) Final Performance Test.
  • Accept functional tests.
  • Review O&M manuals.
  • Verify Owner Training.
  • Create final Technical Commissioning report.

Post-Occupancy Phase Activities:

  • Technical Commissioning Schedule.
  • Deferred Testing.
  • Lessons learned workshop.
  • Create performance verification system.
  • Create Warranty Issue Log.
  • Perform and document performance verification tests (PVT).
  • Optimize system performance.
  • Issue Resolution.
  • Create post-occupancy Technical Commissioning report.